Following a review of regulatory issues with the original plant, Dinsca decided to build a new facility on an adjacent plot. The facility will have the capability to manufacture a range of topical and oral products on a facility that extends over four floors. The building was constructed from sketch layouts created by STC using local contractors and the clients own construction expertise. However the mechanical systems were designed in detail by STC who also provided ongoing support. STC used BIM design technology top ensure that the utilities fitted within the building shell and co-ordination error were eliminated.